THE PROJECT:
This project consisted of the build of 10 x Mechanical Services Switchboards (MSSBs) to power the mechanical services of a grand facility that spans across 9800 square metres. Massey University Innovation Centre is envisioned to be the home of science innovation and research, aimed at fostering a collaborative environment that connects the University with industry and the local community.
BUILD:
- 10 x MSSBs ranging from 100A-400A
TIMEFRAME:
- 4.5 Months
Switchboards + Control Panels Built by Electricians for Electricians
Contact us